In a significant development, the Aowin Municipal Engineer visited the site designated for constructing the 1000-seater capacity auditorium yesterday, the, 25th March 2025. The site, which has been identified as suitable for the project, was inspected by the engineer to assess its readiness for construction. The Municipal Engineer’s visit marks a positive step towards kick-starting…
ALL RIGHTD RESERVED | ENCHICOE TV | Powered by WordPress | Theme by TheBootstrapThemes